Bridge Rehabilitation Projects

 

Blackfriars Bridge - London, ON

Owner: City of London
Consultant: Dillon Consulting Ltd.
Contractor: McLean Taylor Construction Ltd.
Scope: Fabrication and Delivery

• Fabrication of new components and rehabilitation of existing features for the 140 year-old, 68m single span, single land road bridge

• Fabricated new chords, floor beams, stringers, diagonal bracing, and portals

• Rehabilitation of phoenix, struts and portal lattice


Collingwood Street Bridge Replacement - Creemore, ON

Owner: County of Simcoe
Consultant: AECOM
Contractor: Premier Concrete Inc.
Scope: Removal, Rehabilitation, Fabrication, Delivery, Erection and Coating

• Removal, refurbishment, and coating of two 31m trusses built in 1902 and of historical significance

• Reinstallation of trusses on new concrete box girder structure, supply and installation of new upper cross members, diagonals and portals to facilitate wider than original deck surface


International Control Dam Rehabilitation - Niagara Falls, ON

Owner: Ontario Power Generation
Consultant: D.M. Wills Associates Ltd.
Contractor: GDB Constructeurs
Scope: Fabrication, Delivery and Coatings

• 400 tons, 350AT CAT3 prefabricated components to reinforce existing 18 concrete spans

• Galvanized after fabrication

• Erected at the International Control Dam above the Horseshoe Falls


Vidal Walkway Bridge Rehabilitation - Sarnia, ON

Owner: City of Sarnia
Consultant: Wood 
Contractor: Carlington Construction
Scope: Fabrication, Coatings, Delivery, and Erection

• 2 girder lines totalling 81.8m in length and 2.1m tall to support existing watermain 

• 6 girders 

• Coating of top surface of main girder bottom flange plates and lower 300mm of web plates with a 3-coat system

• Coating of outriggers at piers and abutments with a 3-coat system

• Erection completed in one mobilization over CNR rail corridor


MTO 2015-4013 Otonabee River Bridge - Peterborough, ON

Owner: Ministry of Transportation Ontario
Consultant: G.D. Jewell Engineering
Contractor: Looby Construction


Rehabilitation of the Wellington Street Bridge - Lindsay, ON

Owner: City of Kawartha Lakes
Consultant: D.M. Wills Associates Ltd.
Contractor: GMP Contracting Ltd.
Scope: Design, Fabrication, Delivery, Erection and Jacking
 

• 15m over length, 1.5m clear width galvanized Cantilever walkway with galvanized grating decking

• Erection completed in one mobilization under Wellington Street

• Jacking of Wellington Street with designed and fabricated jacking brackets  

• Jacking completed using synchronized method and completed in two mobilizations