coated truss Bridge projects

Credit Meadows Harris Lands Pedestrian Bridges - Mississauga, ON
Owner: City of Mississauga
Consultant: R.J. Burnside & Associated Ltd.
Contractor: Mopal Construction Ltd.
Scope: Design, Fabrication, Coatings, Delivery and Erection
• 51.6m span, 3.5m clear width prefabricated warren modified bowstring truss pedestrian bridge with Kebony decking and wood curbs
• Galvanized
• Tandem lift erection completed in one mobilization


Exhibition Station Temporary Bridges - Toronto, ON
Owner: Metrolinx
Consultant: Comtech
Contractor: Kenaidan Contracting Ltd.
Scope: Design, Fabrication, Coatings, Delivery and Erection
• 56m span, 4.6m clear width prefabricated box truss pedestrian bridge
• 26m span, 4.6m clear width prefabricated box truss pedestrian bridge over the Metrolinx rail corridor at Exhibition GO station
• Bridges painted with a 3-coat system to OPSS 911
• Night erection over the Metrolinx rail corridor for the 26m in one mobilization
• Tandem lift erection completed for the 56m in one mobilization
• Galvanized structural steel - (3) staircases and towers, (2) mini-platforms, (4) hub rooms and miscellaneous metals


King-Liberty Pedestrian/Cycle Bridge - Toronto, ON
Owner: City of Toronto
Consultant: AECOM
Contractor: Grascan Construction Ltd.
Scope: Fabrication, Delivery, Erection and Coatings
• 55 span, 4m clear width enclosed and climate controlled pedestrian bridge over the Metrolinx rail corridor in Liberty Village, Toronto
• Galvanized stair and elevator tower structural steel on both North and South end of bridge structure
• Erection completed in multiple mobilizations

Rehabilitation of Mill Pond Bridge - Omemee, ON
Owner: City of Kawartha Lakes
Consultant: D.M. Wills Associates Ltd.
Contractor: GMP Contracting Ltd.
Scope: Fabrication, Delivery, Erection and Galvanizing
• Truss bridge 24.6m in length, single lane structure with 54m externally cantilevered walkway
• Aesthetic replication of the previous structure
• 109m of box beam rail and lattice pedestrian barrier
• Erection completed in two mobilizations
Nelson Street Pedestrian Overpass Superstructure Replacement - Sudbury, ON
Owner: City of Greater Sudbury
Consultant: WSP
Contractor: GDB Constructeurs
Scope: Design, Fabrication, Coatings, Delivery and Erection
• 51.7m span, 3m clear width prefabricated pratt truss pedestrian bridge with galvanized deck pan to accept concrete
• Galvanized
• Wire mesh panels
• Tandem lift erection completed in one mobilization
• 28m of decorative galvanized approach railings
Taunton Road at Oshawa Creek Bridge Rehabilitation - Oshawa, ON
Owner: Regional Municipality of Durham
Consultant: GHD Inc.
Contractor: Alliance Verdi Civil Inc.
Scope: Design, Fabrication, Delivery, Erection and Coatings
• Two 23m end spans and one 65m main span, 3m clear width prefabricated truss pedestrian bridge
• Corten steel painted with 3-coat paint system
• Anti-slip galvanized steel deck planks
• Erection completed in one mobilization




Right Honourable Herb Gray Parkway - Windsor, ON
Owner: Ministry of Transportation Ontario
Consultant: Hatch Mott MacDonald
Contractor: Parkway Infrastructure Constructors
Scope: Design, Fabrication, Delivery, Erection and Coatings
• One 20m span x 4m prefabricated pedestrian bridge
• Four 40m span x 4m prefabricated pedestrian bridges
• Two 60m span x 4m prefabricated pedestrian bridges
• One 60m span x 4m prefabricated pedestrian bridge
• Complete 3-part paint system
• High performance Matacryl waterproofing/wear surface applied over precast concrete deck panels connected to superstructure via shear stud/CIP ductal concrete detail
• Erection completed in multiple mobilizations to suit overall project schedule

Stubbswood Square Pedestrian Bridges - Scarborough, ON
Owner: City of Toronto
Consultant: Morrison Hershfield Consultants
Contractor: Marbridge Construction Ltd.
Scope: Design, Fabrication, Coatings, Delivery and Erection
• 22.1m span, 3m clear width prefabricated pratt truss pedestrian bridge
• 25.3m span, 3m clear width prefabricated pratt truss pedestrian bridge
• Galvanized
• Bridges painted with a 2-coat system to OPSS 911
• 51m of galvanized handrail
• 30m total galvanized and painted approach railing for bridges
• Erection completed in one mobilization for each bridge