coated truss Bridge projects

 

Credit Meadows Harris Lands Pedestrian Bridges - Mississauga, ON

Owner: City of Mississauga 
Consultant: R.J. Burnside & Associated Ltd.
Contractor: Mopal Construction Ltd.
Scope: Design, Fabrication, Coatings, Delivery and Erection
 

• 51.6m span, 3.5m clear width prefabricated warren modified bowstring truss pedestrian bridge with Kebony decking and wood curbs

• Galvanized 

• Tandem lift erection completed in one mobilization


Exhibition Station Temporary Bridges - Toronto, ON

Owner: Metrolinx
Consultant: Comtech
Contractor: Kenaidan Contracting Ltd.
Scope: Design, Fabrication, Coatings, Delivery and Erection
 

• 56m span, 4.6m clear width prefabricated box truss pedestrian bridge 

• 26m span, 4.6m clear width prefabricated box truss pedestrian bridge over the Metrolinx rail corridor at Exhibition GO station

• Bridges painted with a 3-coat system to OPSS 911

• Night erection over the Metrolinx rail corridor for the 26m in one mobilization 

• Tandem lift erection completed for the 56m in one mobilization

• Galvanized structural steel - (3) staircases and towers, (2) mini-platforms, (4) hub rooms and miscellaneous metals


King-Liberty Pedestrian/Cycle Bridge - Toronto, ON

Owner: City of Toronto
Consultant: AECOM
Contractor: Grascan Construction Ltd.
Scope: Fabrication, Delivery, Erection and Coatings

• 55 span, 4m clear width enclosed and climate controlled pedestrian bridge over the Metrolinx rail corridor in Liberty Village, Toronto

• Galvanized stair and elevator tower structural steel on both North and South end of bridge structure

• Erection completed in multiple mobilizations


Rehabilitation of Mill Pond Bridge - Omemee, ON

Owner: City of Kawartha Lakes
Consultant: D.M. Wills Associates Ltd.
Contractor: GMP Contracting Ltd.
Scope: Fabrication, Delivery, Erection and Galvanizing

• Truss bridge 24.6m in length, single lane structure with 54m externally cantilevered walkway

• Aesthetic replication of the previous structure

• 109m of box beam rail and lattice pedestrian barrier

• Erection completed in two mobilizations


Nelson Street Pedestrian Overpass Superstructure Replacement - Sudbury, ON

Owner: City of Greater Sudbury
Consultant: WSP
Contractor: GDB Constructeurs
Scope: Design, Fabrication, Coatings, Delivery and Erection
 

• 51.7m span, 3m clear width prefabricated pratt truss pedestrian bridge with galvanized deck pan to accept concrete

• Galvanized 

• Wire mesh panels 

• Tandem lift erection completed in one mobilization 

• 28m of decorative galvanized approach railings


Taunton Road at Oshawa Creek Bridge Rehabilitation - Oshawa, ON

Owner: Regional Municipality of Durham
Consultant: GHD Inc.
Contractor: Alliance Verdi Civil Inc.
Scope: Design, Fabrication, Delivery, Erection and Coatings

• Two 23m end spans and one 65m main span, 3m clear width prefabricated truss pedestrian bridge

• Corten steel painted with 3-coat paint system

• Anti-slip galvanized steel deck planks

• Erection completed in one mobilization


Right Honourable Herb Gray Parkway - Windsor, ON

Owner: Ministry of Transportation Ontario
Consultant: Hatch Mott MacDonald
Contractor: Parkway Infrastructure Constructors
Scope: Design, Fabrication, Delivery, Erection and Coatings

• One 20m span x 4m prefabricated pedestrian bridge

• Four 40m span x 4m prefabricated pedestrian bridges

• Two 60m span x 4m prefabricated pedestrian bridges

• One 60m span x 4m prefabricated pedestrian bridge

• Complete 3-part paint system

• High performance Matacryl waterproofing/wear surface applied over precast concrete deck panels connected to superstructure via shear stud/CIP ductal concrete detail

• Erection completed in multiple mobilizations to suit overall project schedule


Stubbswood Square Pedestrian Bridges - Scarborough, ON

Owner: City of Toronto
Consultant: Morrison Hershfield Consultants
Contractor: Marbridge Construction Ltd.
Scope: Design, Fabrication, Coatings, Delivery and Erection

• 22.1m span, 3m clear width prefabricated pratt truss pedestrian bridge 

• 25.3m span, 3m clear width prefabricated pratt truss pedestrian bridge 

• Galvanized 

• Bridges painted with a 2-coat system to OPSS 911

• 51m of galvanized handrail 

• 30m total galvanized and painted approach railing for bridges

• Erection completed in one mobilization for each bridge