BW Feed & Seed Ltd. Bins - New Hamburg, ON
Owner: Mitchel Mill Systems Canada
Consultant: Witzel Dyce Engineering Inc.
Scope: Fabrication, Coatings, Delivery, and Erection
• 27 Agricultural bins
• 8 Load out bins
• 19 Ingredient bins
• 55’ bin bodies with primary hoppers
• Bins and hoppers primed and painted
• Erection completed in two mobilizations

New Hamburg Water Wheel Replacement - New Hamburg, ON
Owner: New Hamburg Board of Trade
Consultant: Stephen B. Clarke & Associates Ltd. Consulting Engineers
Scope: Design, Fabrication, Delivery and Erection
• 50’ Diameter Corten water wheel
• Prefabricated Corten plate hub
• 6” diameter solid center shaft
• Erection completed in one mobilization onto existing column legs





Portland Commons Diagonal Steel Strut - North York, ON
Owner: Carttera – Portland Commons LP
Contractor: Lorvin Steel Ltd.
Scope: Fabrication, Coatings and Delivery
• 11 diagonal steel struts 36” dia. x 1.375” pipe 72’ long fabricated with lugs and baseplates
• Primed
• Finished to AESS 3 Specifications





Angus Glen Community Park Construction - Markham, ON
Owner: City of Markham
Consultant: Dillon Consulting Ltd.
Contractor: Mopal Construction
Scope: Fabrication, Coatings, Delivery, and Erection
• 3 decorative Trellis’ with rolled members
• Galvanized
• Painted 2-coat system
• 1 Stainless Steel decorative Water feature trellis with rolled members
• Decorative entry sign
• Structural steel for washroom building
• Erection completed in two mobilizations



Markham SECC Park – Pavillion Structure - Markham, ON
Consultant: Kavski Engineering Ltd.
Contractor: Cambium Site Contracting
Scope: Design, Fabrication, Delivery and Erection
• 15.9m wide, 9.8m long and 3.5m clearance from grade shade structure
• Roofed and sided
• Painted 2-coat system
• Erection completed in one mobilization
Goderich Performance Stage - Goderich, ON
Owner: Town of Goderich
Consultant: Allan Avis Architects Inc.
Contractor: Westhoek Construction Ltd.
Scope: Design, Fabrication, Coatings, Delivery and Erection
• Decorative structural steel shade structure with rolled members
• Cedar wood plates and purlins
• Polycarbonate roofing system
• Painted 2-coat system
• Erection completed in one mobilization


Ramsden City Park Signs and Staircase - Toronto, ON
Owner: City of Toronto
Consultant: Blackwell
Contractor: Mopal Construction Ltd.
Scope: Design, Fabrication, Delivery and Erection
• 117m total length, 2.1m clear width prefabricated truss switchback ramp
• 17.9m access staircase
• Miscellaneous Corten and Stainless-steel architectural features
• Erection completed in multiple mobilizations




East Point Bird Sanctuary – Pavilions & Landscape Elements - Scarborough, ON
Owner: Toronto and Region Conservation Authority
Contractor: Hawkins Contracting Services Ltd.
Scope: Fabrication, Delivery and Erection
• Weathering steel bird blinds profile cut with decorative pattern
• 2 weathering steel main pavilions with water jet panels consisting of 5000 bird cut outs
• Galvanized grating
• Weathering steel edging
• Weathering steel entry signs
• Erection completed in two mobilizations


East Don Trail Tunnel - North York, ON
Owner: Toronto and Region Conservation Authority
Consultant: R.J. Burnside & Associates Ltd.
Contractor: Soncin Construction
Scope: Design, Fabrication, Delivery and Erection
• 185m total length, 4m clear width prefabricated West bridge approach structure
• 52.5m long, 4m clear width prefabricated pedestrian bridge
• Corten mesh enclosing ramp and bridge
• Stainless steel handrail on ramp and bridge
• Erection completed in two mobilizations


Mary Allen Park Shade Structure - Waterloo, ON
Owner: City of Waterloo
Contractor: Pine Valley Corporation
Scope: Design, Fabrication, Delivery and Erection
• 7m total length, 5m wide Corten shade structure
• Powder coated splice plates
• Painted metal roof panels
• Erection completed in one mobilization





Oakville Harbour Walkway and Stair Renovation - Oakville, ON
Owner: Town of Oakville
Contractor: Three Seasons Landscapes
Scope: Design, Fabrication, Delivery and Erection
• 12m overall plan length, 1.5m wide Corten staircase
• Galvanized bolt on grip-span stair treads
• Erection completed in one mobilization