MTO 2018-4008 County Road 2/34 Underpass - Lancaster, ON
Owner: Ministry of Transportation Ontario
Consultant: Dillon Consulting Ltd.
Contractor: R.W. Tomlinson Ltd.
Scope: Fabrication, Delivery, Erection and Coatings
• 3 girder lines totalling 90m in length
• 9 tub girders, skewed geometry
• 3-part paint system on girder ends
• Erection completed in one nighttime, weekend mobilization
MTO 2018-4008 Hwy 401 Eastbound and Westbound Lanes at Raisin River - Lancaster, ON
Owner: Ministry of Transportation Ontario
Consultant: Dillon Consulting Ltd.
Contractor: R.W. Tomlinson Ltd.
Scope: Fabrication, Delivery, Erection and Coatings
• EBL – 5 girder lines totalling 67.5m in length
• WBL – 5 girder lines totalling 67.5m in length
• 33 girders, haunched at piers
• 3-part paint system on girder ends and exterior field splices
• Construction staged over 2 seasons
2022-3009 Highway 401/Dorchester Road Underpass Replacement and Interchange Improvements - Dorchester, ON
Owner: Ministry of Transportation Ontario
Consultant: Dillon Consulting Ltd.
Contractor: Facca Inc.
Scope: Fabrication, Delivery, and Coatings
• 4 girder lines totalling 90m in length
• 12 tub girders, skewed geometry
• 3-part paint system on girder ends

MTO 2022-3008 Glanworth Bridge - London, ON
Owner: Ministry of Transportation Ontario
Consultant: Dillon Consulting Ltd.
Contractor: Facca Inc.
Scope: Fabrication, Delivery, and Coatings
Glanworth Bridge:
• 2 girder lines totalling 74m in length
• 6 tub girders, skewed geometry
• 3-part paint system on girder ends
Maple GO Pedestrian Bridge - Vaughan, ON
Owner: Metrolinx
Consultant: AECOM
Contractor: Kenaidan Contracting Ltd.
Scope: Fabrication, Delivery, Erection and Coatings
• 1 tub girders totalling 35m in length, skewed geometry
• 3-part paint system on girder ends
• Erection completed in one weekend mobilization
Replacement of Forks Road Bridge - Welland, ON
Owner: Corporation of Welland
Consultant: WSP
Contractor: Rankin Construction Inc.
Scope: Fabrication, Delivery, and Coatings
• 5 girder lines totalling 137.1m in length
• 25 girders
• 10 girders haunched at piers
• 4 girders kinked
• 3-part paint system on girder ends


Central Avenue Bridge Replacement - Fort Erie, ON
Owner: Niagara Region Public Works
Consultant: Hatch Mott MacDonald
Contractor: Rankin Construction Inc.
Scope: Fabrication, Delivery, Erection and Coatings
• 4 girder lines totalling 114.7m in length
• 20 girders haunched at piers
• 3-part paint system on girder ends
• Construction staged over 2 seasons
• Erected on temporary piers in one mobilization
• Contractor formed and poured the cast in place concrete deck
• Entire structure was jacked up, placed on rollers and jacked laterally into the final position to match the existing road centerline after the removal of the existing bridge


Fifth Street Bridge over the Thames River - Chatham, ON
Owner: Municipality of Chatham-Kent
Consultant: Dillon Consulting Ltd.
Contractor: Looby Construction
Scope: Fabrication, Delivery, Erection and Coatings
• 7 girder lines totalling 76.3m in length
• 21 girders
• 3-part paint system on girder ends and exterior field splices
• Erection completed in one mobilization


Fountain Street Reconstruction and Superstructure Replacement - Kitchener, ON
Owner: Region of Waterloo
Consultant: Parsons
Contractor: McLean Taylor Construction Ltd.
Scope: Fabrication, Delivery, Erection and Coatings
• 6 girder lines totalling 147.8m in length
• 42 girders haunched at piers
• 3-part paint system on girder ends
• Construction staged over 2 seasons