Self-Weathering Steel Truss Bridge Projects

 

Thames Valley Parkway – North Branch - London, ON

Owner: City of London
Consultant: Dillon Consulting Ltd. 
Contractor: Hayman Construction Ltd.
Scope: Design, Fabrication, Delivery and Erection
 

• Ross Park Bridge – Two 20m end spans and one 60m main span, 4m clear width prefabricated truss pedestrian bridge

• Athletic Field Bridge – One 20m end span, one 25m end span and one 60m main span, 4m clear width prefabricated truss pedestrian bridge

• Metal deck pan for CIP concrete deck

• Erection completed in multiple mobilizations


Whirlpool Road Multi-Use Pathway Pedestrian Bridge - Niagara, ON

Owner: City of Niagara Falls
Consultant: Ellis Engineering Inc.
Contractor: Rankin Construction Inc.
Scope: Design, Fabrication, Delivery and Erection
 

• 60m main span, 3m clear width prefabricated Box truss pedestrian bridge

• Corten steel deck plate with Matacryl surface

• Erection completed in one mobilization


Silver Lake Improvements - Waterloo, ON

Owner: City of Waterloo
Consultant: Ecosystem Recovery Inc.
Contractor: Seawaves Development Services Inc.
Scope: Design, Fabrication, Delivery and Erection
 

• 32.9m span, 3.2m clear width prefabricated Bowstring pedestrian bridge

• Anti-slip Corten Metal Deck

• Erection completed in one mobilization


Rowntree Mills Park North Bridge & Pathway Rehabilitation - North York, ON

Owner: City of Toronto
Consultant: Cosburn Nauboris Ltd. 
Contractor: Mopal Construction
Scope: Design, Fabrication, Delivery and Erection
 

• 55m span, 3.5m clear width prefabricated truss pedestrian bridge

• Anti-slip Corten steel deck

• Decorative external vertical braces

• Erection completed in one mobilization with a tandem lift


East Don Trail Construction – Phase 1 and Phase 2 - North York, ON

Owner: Toronto and Region Conservation Authority
Consultant: Aquafor Beech Ltd.
Contractor: Metric Contracting Services Corporation
Scope: Design, Fabrication and Delivery

• Three 40m span x 4m prefabricated pedestrian bridges

• Two 45m span x 4m prefabricated pedestrian bridges

• One 55m span x 4m prefabricated pedestrian bridge

• One 60m span x 4m prefabricated pedestrian bridge

• 82m of Boardwalks

• 3,369m of railings, all utilizing fabricated Corten T posts, various rail systems including laser cut panels, Corten Mesh and Douglas Fir rails 


Phase 2 – Multi-Use Pathway Construction Through the Rouge River Valleys Including the Construction of Four Pedestrian Bridges - Markham, ON

Owner: City of Markham
Consultant: Brown Co.
Contractor: Hawkins Contracting Services Ltd. 
Scope: Design, Fabrication, Delivery and Erection

• Two 28m span, 3m clear width prefabricated truss pedestrian bridge

• Two 37m span, 3m clear width prefabricated truss pedestrian bridge

• One 70m total length,3m clear width prefabricated boardwalk  

• One 48m total length,3m clear width prefabricated boardwalk  

• One 17m total length,3m clear width prefabricated boardwalk  

• Erection completed in multiple mobilizations


Box Grove Community Park Pedestrian Bridge - Markham, ON

Owner: City of Markham
Consultant: Witzel Dyce Engineering Inc.
Contractor: Rutherford Contracting Ltd.
Scope: Design, Fabrication, Delivery and Erection

• 58.5m span, 3.5m clear width prefabricated bowstring pedestrian bridge

• Erection completed in one mobilization with a tandem lift


East Don Pedestrian/Cycle Bridge Construction Project - North York, ON

Owner: Toronto and Region Conservation Authority
Consultant: R.J Burnside & Associates Ltd.
Contractor: Soncin Construction
Scope: Design, Fabrication, Delivery and Erection

• 55m span, 4m clear width prefabricated truss pedestrian bridge

• West Approach Structure – 3 level ramp totalling 174m

• Anti-slip Corten steel deck

• Corten Mesh enclosure panels for bridge and West Approach Structure 

• Erection completed in two mobilizations


Homer Watson Boulevard Improvements – Three Pedestrian Bridges - Kitchener, ON

Owner: Region of Waterloo
Consultant: Associated Engineering
Contractor: Capital Paving Inc.
Scope: Design, Fabrication, Delivery and Erection

• 33m span, 4m prefabricated truss pedestrian bridge

• 35m span, 4m prefabricated truss pedestrian bridge

• 64.5m three span, 4m prefabricated truss pedestrian bridge

• Metal deck pan for CIP concrete deck

• Erection completed in multiple mobilizations 


Upper Highland Creek at Ellesmore Road – Pan Am Path Connection Project - Scarborough, ON

Owner: Toronto and Region Conservation Authority
Consultant: Aquafor Beech Ltd.
Contractor: Bronte Construction
Scope: Design, Fabrication, and Delivery
 

• Three 60m span, 4m clear width prefabricated box truss pedestrian bridge

• One 24m span, 4m clear width prefabricated pratt truss pedestrian bridge

• Anti-slip Corten steel deck


McHugh and Hawthorne Pedestrian Bridges - Windsor, ON

Owner: City of Windsor
Consultant: Wood
Contractor: JCS Construction Inc.
Scope: Design, Fabrication, Delivery and Erection

• McHugh Bridge – 37.4 span, 2.44m clear width prefabricated truss pedestrian bridge

• Hawthrone Bridge – 35.6 span, 2.44m clear width prefabricated truss pedestrian bridge

• Anti-slip Galvanized Metal Deck

• Erection completed in multiple mobilizations 


Trowbridge Falls - Thunder Bay, ON

Owner: City of Thunder Bay
Consultant: JML Engineering
Contractor: City of Thunder Bay
Scope: Design, Fabrication, Delivery and Erection Supervision

• 40m span bow String Truss

• 3.2m tall Arch

• Cast-in-place concrete on composite metal deck pan

• Erection completed in one mobilization


Aspen Ridge Linear Park Pedestrian Bridges - Saskatoon, SK

Owner: City of Saskatoon
Consultant:
Crosby Hanna & Associates
Contractor: Wilco Contractors Southwest Inc.
Scope: Design, Fabrication, Delivery and Erection

• Two 15m span, 2.4m clear width prefabricated pratt truss pedestrian bridge

• One 19m span, 2.4m clear width prefabricated pratt truss pedestrian bridge

• IPE handrail

• Eight approach rails with decorative Corten logo panel


Twyn Rivers Day-Use Area and Trails Pedestrian Bridges Scarborough, ON

Owner: Parks Canada
Consultant: WSP
Contractor: TDI International AG Inc. 
Scope: Design, Fabrication, Delivery and Erection

• 34m span, 2.4m clear width prefabricated pratt truss pedestrian bridge

• 27m span, 2.4m clear width prefabricated pratt truss pedestrian bridge

• 52m of decorative Corten railings 

• Erection completed in three mobilizations


Epping Bridge Replacement - Kimberly, ON

Owner: Municipality of Grey Highlands
Consultant: R.J Burnside & Associates Ltd.
Scope: Design, Fabrication, Delivery and Erection

• 30m single span modified Warren Truss

• 5m clear width, single land road bridge

• Loading; CL625 ONT Truck, single land road bridge

• Cast-in-place concrete deck on composite metal deck pan

• Erection completed in one mobilization


G2G Trail – Millbank Pedestrian Bridge - Millbank, ON

Owner: Village of Millbank Association
Consultant: Witzel Dyce Engineering Inc.
Scope: Design, Fabrication, Delivery and Erection

• 27m span, 2.5m clear width prefabricated truss pedestrian bridge

• Erection completed in one mobilization


Burnhamthorpe Road Trail – Pedestrian Bridges - Mississauga, ON

Owner: City of Mississauga
Consultant: Planmac Engineering Inc.
Contractor: Serve Construction Ltd.
Scope: Design, Fabrication, Delivery and Erection

• 55m span x 3m prefabricated Box Truss

• 26.5m span x 3m prefabricated Box Truss

• 16m span x 3m prefabricated Pratt Truss

• Loading; 80kN maintenance vehicle

• Anti-slip Corten Steel Deck

• Erection completed in one mobilization


CPR Pedestrian Overpass, MI. 30.56 Galt Subdivision - Milton, ON

Owner: Town of Milton
Consultant: Planmac Engineering Inc.
Contractor: Grascan Construction Ltd.
Scope: Design, Fabrication, Delivery and Erection

• 30.4m span, 2.2m clear width prefabricated truss pedestrian bridge

• Rolled metal roof

• 12mm tempered glass side enclosure

• Erection completed in one mobilization