Signature Bridge PRojects

Rouge Valley Trail and Pedestrian Bridge Construction - Markham, ON
Owner: City of Markham
Consultant: Entuitive
Contractor: Melfer Construction Inc.
Scope: Fabrication, Delivery and Erection
• 142m cable stayed bridge on eight bents, precast concrete deck, galvanized and stainless steel pedestrian barrier and railing
• 58.5m single span, cable stayed bridge with wood deck
• 37m prefabricated truss pedestrian bridge
• Erection completed in multiple mobilizations
Walter Bean Trail - Kitchener, ON
Owner: City of Kitchener
Consultant: R.J. Burnside & Associates Ltd.
Contractor: Gateman Milloy Inc.
Scope: Design, Fabrication, Delivery and Erection
• 75m span Bow String Truss
• 5.5m tall Arch
• Cast-in-place concrete on composite metal deck pan
• Erection completed in one mobilization





Highway 7/8 Pedestrian and Cycling Bridge - Kitchener, ON
Owner: Region of Waterloo
Consultant: Entuitive and BT Engineering
Contractor: Eiffage Canada
Scope: Fabrication, Delivery, Assembly, Erection and Coatings
• 52.8m span, 3.9m clear width prefabricated pedestrian bridge
• Galvanized
• Painted 2-coat system as per OPSS 911
• Stainless steel cable railing system
• Assembly of bridge performed to precast in place anchors in completed concrete deck in one mobilization
• 385m Stainless steel 316 polished railings on approach structures



Glen Road Pedestrian Bridge and Tunnel Replacement - Toronto, ON
Owner: City of Toronto
Consultant: Morrison Hershfield Consultants
Contractor: Eiffage Canada
Scope: Fabrication, Coatings, Pre-assembly and Delivery
• 100.5m span, 4.8m clear width pedestrian bridge
• 3 girder lines totally 15 girders, with structural steel legs
• Galvanized
• Painted 2-coat system as per OPSS 911
• Pre-assembly of bridge sections prior to delivery
Dalewood Bridge Replacement - St. Thomas, ON
Owner: City of St. Thomas
Consultant: Entuitive
Contractor: McLean Taylor Construction Ltd.
Scope: Fabrication, Delivery, Erection and Coatings
• 2 girder lines totalling 50.6m in length
• 4 fabricated box girders, 1 pile cap floor beam assembly, 16 intermediate floor beams, 14 cantilevered floor beams, 2 pylons and 12 stay braces
• 3-part paint system on girder ends and all above deck steel
• Erection completed in one mobilization
Replacement of Joyce Archdekin Park Pedestrian Bridge Over Etobicoke Creek - Brampton, ON
Owner: City of Brampton
Consultant: Chisholm, Fleming and Associates
Contractor: GMP Contracting Ltd.
Scope: Fabrication, Coatings, Delivery and Erection
• 20.2m span, 4.46m clear width Pedestrian Bridge fabricated with 2 girder lines
• Galvanized
• Painted 2-coat system as per OPSS 911
• Laminated decorative timber deck
• Erection completed in one mobilization





Hilton Niagara Pedestrian Bridge - Niagara Falls, ON
Owner: Hilton Niagara
Contractor: Niagara Rigging & Erecting Company Ltd.
Scope: Fabrication and Coatings
• 24m span, 7.2m arched top chord bridge structure connecting Fallsview Casino and the Hilton Hotel
• Structure was fabricated in one piece in our shop and then cut at strategic splice locations to facilitate transportation and efficient field assembly
Elliott Bridge - Angus, ON
Owner: County of Simcoe
Consultant: R.J. Burnside & Associates Ltd.
Contractor: Trisan Construction
Scope: Fabrication, Delivery, Erection and Coatings
• 13 girder lines totalling 85m in length
• 39 girders
• 3-part paint system on girder ends and splice locations
• Erection completed in two mobilizations