Winner of multiple awards, the Nightstar Bridge is a 28m single span pedestrian bridge. It features a painted finish superstructure, internally illuminated laser cut aluminum panels and Ipe wood handrails.

To see more projects from Iron Bridge CLICK HERE

 

 

 

 

Iron Bridge was tasked with the design-build of one 20m, four 40m, and two 60m clear span pedestrian bridges. All seven bridges were built to MTO standards and included 350 AT Cat. 2 steel and a three-part coating system complying with OPSS 911. These seven bridges connected the more than 11km trail system meandering through the Windsor-Essex Parkway.

To see more projects from Iron Bridge CLICK HERE

 

 

 

 

Replacement of the eastbound lanes' 95.7m bridge and the westbound lanes' 121.7m bridge on Hwy 417 east of Ottawa. Iron Bridge fabricated, coated, delivered, and erected 510 tons of 350AT Cat. 2 welded wide flange girders and diaphragms. Erection of the eastbound bridge was completed during a nighttime single lane closure, while erection of the westbound bridge was completed with all lanes open.

To see more projects from Iron Bridge CLICK HERE

 

 

 

 

A northbound truck impacted the horizontal strut in the south portal of the Burlington Skyway, damaging the horizontal strut and main T-brace. The accident forced the immediate closure of all northbound lanes of the Skyway on the Friday of the Civic Holiday long weekend. Iron Bridge performed removal of the damaged components as well as the installation of the replacement components to restore traffic flow.

To see more projects from Iron Bridge CLICK HERE

 

 

 

 

After losing its band shelter to the 2011 tornado, the town of Goderich, Ontario awarded the contract for the construction of this new performance stage. This complex structure features an asymmetric and tilted tri-chord truss, fabricated T-sections, curved cedar joists, and polycarbonate roof.

To see more projects from Iron Bridge CLICK HERE