Iron Bridge was tasked with the design-build of one 20m, four 40m, and two 60m clear span pedestrian bridges. All seven bridges were built to MTO standards and included 350 AT Cat. 2 steel and a three-part coating system complying with OPSS 911. These seven bridges connected the more than 11km trail system meandering through the Windsor-Essex Parkway.
To see more projects from Iron Bridge CLICK HERE